Installation regulations of ductile iron pipe
1. Before the project construction, the pipe fittings, pipe materials and rubber ring shall be inspected once, and it shall not be applied if it is found that they are not good.
2. Sliding in "T" type jack is generally used for pipeline installation. If the jack is inserted into the socket in place, it is ok. Engineering construction practice experience: this kind of socket has reliable tightness, excellent durability and corrosion resistance, easy to use, easy to grasp the installation technology, improve the labor standard, quality reliable, after the socket can be tested, is a relatively good way of the socket.
The installation procedure is to clear the socket of the socket -- clear the rubber ring -- top the rubber ring and bottom the pipe -- install the machine -- machine equipment -- lubricate the surface of the socket and the rubber ring brush -- push the water pipe to insert it into the socket -- check.
3. Installation process:
Buried pipe: should press and hold the technical standard of the pipe will be the water pipe at the bottom of the trough, the general selection of artificial services under the pipe method or mechanical equipment under the pipe method;
(2) to clear the branch pipe: to clean all the dirty things inside the socket.
Clear the rubber ring, the rubber ring: the adhesive on the rubber ring clean clean clean, the rubber ring bend into the "red plum" or "8" into the groove, and hand along all the rubber ring lightly pressed once, or with the eraser hammer hit solid, to ensure that each part of the rubber ring is not warped and twisted, symmetrical consistent stuck in the groove;
(4) brush and apply lubricant on the outer surface of the socket and the rubber ring: brush and apply lubricant evenly on the inner surface of the rubber ring installed on the socket, brush and apply lubricant on the outer surface of the socket to brush all the positions of the socket outside the socket line, the weld is of vital importance;
The installation of pipe: because the net weight of the pipe itself is light, in the installation of a single galvanized steel wire rope, it is very easy to make pipe azimuth deviation, resulting in rubber ring is squeezed, can not be installed in time. Therefore, double chain parallel surface can be selected to make the installation of the parallel surface of the pipe, the rubber ring will not be squeezed, can be installed in time; Also can choose the method of lengthening pipe, with a single stainless steel wire to carry out the installation;
Installation of machinery and equipment: will be prepared in advance of the installation of machinery and equipment in a timely manner, the installation of attention will not have to clean up the water pipe position again environmental pollution;
Push the top of the pipe so that it is inserted into the socket: in the installation, in order to insert the socket into the socket inside the more energy saving, complete. First, put the socket into the socket and the socket is pressed on the rubber ring of the socket, connect the galvanized steel wire rope and the inverted chain, tighten the inverted chain; In addition, the pipe should be made to move the pipe up and down vigorously at the end of the pipe socket until the socket is inserted into the socket (marked by the socket line, the first socket line enters into the socket, and the second socket line is almost exactly), with a gap of 2mm between the socket and the socket. And ensure that the distance between the outer side of the socket and the rubber ring is consistent;
8. Check: check whether the position of the socket is in line with the regulations (whether the position of the rubber ring is appropriate and timely to check the gap of the socket with a thick steel ruler).
Two, installation should be aware of a number of problems
1. The rubber ring should be adjusted in the groove of the mouth and rammed by hand.
2. When the water pipe needs to be cut and then installed, the socket end should be produced and processed into the appearance of a weld.
3. When installing the pipe in the bend section through the borrow corner of the pipe socket, install the pipe along the parallel line first and then turn it to the specified Angle of view. In the whole process of installation, a small block shall be used on both sides of the arc to stabilize the paved pipe body to prevent deviation.
4. In the whole process of installation, the pivot line of fixed and moving pipe should be on a parallel line, otherwise it is very easy to shoot the rubber ring and harm the installation.
5. Pipeline installation should be flat, the middle of the water pipe should be a parallel line, there is a skew, need to be from the low to the high level of pavement, will bear the mouth toward the high azimuth.
6. Point the socket of the connecting pipe to the socket, maintain the vertical position of the pipe, and insert a single galvanized steel wire rope into the road marking line at one time. If the friction resistance is too large, avoid forced insertion to prevent the rubber ring from being distorted.
7. When the pipeline installation and pavement project is finally broken, the branch pipe shall be closed with its cover to prevent dirt such as soil and sand from flowing into the pipeline.
Fill properly in the middle of each pipe before hydrostatic test.